BRIDGE

Click on the image for more information.

Green Ha Long Bridge

Client

Vingroup Corp

Contractor

Khang Nguyen

Product

Fixed POT Bearing (FPB)/Guide POT Bearing(GPB)

Vinh Tuy 2 Bridges

Client

HA NOI PROJECT MANAGER UNIT(HPMU)

Contractor

Joint Venture Vinaconex – Trung Chinh/Joint Venture Vinaconex – Trung Chinh/Joint Venture Vinaconex – Trung Chinh

Product

Fix Pot Bearing/Guide Pot Bearing/HDR-S(Semi-fixed)

Lang Am Bridge

Client

Hai Phong Project Management Unit

Contractor

Trung Thuy – Co Khi Xay Dung Thang Long

Product

PAD Bearing/Free POT Bearing(FPB)/Guide POT Bearing(GPB)

Mong Sen Bridge

Client

Lao Cai – Sapa BOT Joint Venture Company

Contractor

Trung Chinh – Xay Dung Viet Nam

Product

Free POT Bearing(FPB)/Guide POT Bearing(GPB)

Cua Hoi Bridge

Client

Ministry of Transport – Project Management Unit 6

Contractor

Joint Stock Trung Chinh – 473 – Tan Nam

Product

High Damping Rubber Bearing(HDR-S)

Ho Chi Minh City Urban Railways

Client

Management Authority for Urban Railways(MAUR)

Contractor

Sumitomo Cienco 6 Constortium

Product

Rubber Bearing(RB)

Song Dao Bridge

Client

UBND Dong Son

Contractor

Hoang Dong Do LTD.,CO

Product

Rubber Bearing(RB)

Vinh Hao Phan Thiet Expressway

Client

Project Management Unit 7

Contractor

Joint Stock Thang Long – Dat Phuong – Tu Lap

Product

Rubber Bearing(RB)

Mumbai Trans Harbour Link Project

Mumbai Trans Harbour Link Project
Photo:JICA
Client

Mumbai Metropolitan Region Development Authority

Contractor

Daewoo-TPL JV

Product

Pot Bearings(BP・B)

North South Commuter Railway

North South Commuter Railway
Client

Department of transportation republic of Philipines

Contractor

Sumitomo Construction CO.,LTD

Product

Rubber Bearing(RB)

Western Bangladesh Bridge

Western Bangladesh bridge
Photo:JICA
Client

Roads and Highway Department(RHD)

Contractor

Mir Akhter Hossain LTD

Product

Rubber Bearing(RB)

Kalna Bridge

Kalna Bridge
Photo:JICA
Client

Government of the people’s republic of Bangladesh

Contractor

TEKKEN – AML – YBC JV

Product

Pot Bearings(BP・B)

Ka Myaw Kinn Bridge Project

Client

Ministry of Construction Myanmar

Contractor

J&M Steel Solutions CO.,Ltd

Product

Rubber Bearing(RB)

Major Bridges Construction Project Of The National Road Network Package-1

Client

Road Development Authority/Sri Lanka

Contractor

Wakachiku Construction Co.,Ltd.

Product

Rubber Bearing(RB)

Muwagama Bridge

Client

Road Development Authority/Sri Lanka

Contractor

Kumagaigumi Corp./Yokogawa Bridge

Product

Spherical Bearing(BP・A)

New Bridge Construction Project over the Kelani River Package-1&2

New Bridge Construction Project over the Kelani River Package-1&2
Client

Road Development Authority/Sri Lanka

Contractor

Toda-JFE-MES JV(PK-1)/SMCC-SANKEN JV(PK-2)

Product

Pot Bearings(BP・B)/Pin Bearing(PN)

Neak Loeung Bridge(Tsubasa Bridge)

Neak loueng bridge(tsubasa bridge)
Client

Kingdom of Cambodia

Contractor

Sumitomo Mitsui Construction Co.,Ltd.

Product

Horizontal Force Dispertion Rubber bearing

Sekong Bridge

Sekong Bridge
Photo:JICA
Client

Lao People's Democratic Republic

Contractor

Taisei Corp.

Product

Sliding Rubber Bearing

Tashuguzar - Kumkurgan

Client

Republic of Uzbekistan Joint Venture Railway Company

Contractor

Shimizu-Nippon Steel Eng.-Yokogawa JV

Product

Line Bearing(LB)/Pin Bearing(PN)/Pin Roller Bearing(PN.HR)

The Project for Reconstruction of Bridge(Phase-1 for 5 bridges)

Client

Ministry of Works and Human Settlement.

Contractor

Dai Nihon Doboku Construction Yokogawa Bridge

Product

Movable&Fix Rubber Bearings

Niari Bridge

Client

Kenya National Highways Authority

Contractor

Sumitomo Mitsui Construction Co.,Ltd.

Product

Steel Finger joint

Mombasa Southern Bypass&Kipevu New Container Terminal Link Road PK-1 Railway Bridge&Agol Bridge

Client

Kenya National Highways Authority

Contractor

China Civil Construction Co.,Ltd.

Product

Pot Bearings(BP・B)/Al-Mg Plasma Arc Thermal Spraying Coating

The Project for Improvement of Tazara Intersection

The Project for Improvement of Tazara Intersection
Photo:JICA
Client

Uganda National Roads Authority

Contractor

Sumitomo Mitsui Construction

Product

PAD Bearing

The Project for Rehabilitation of Trunk Road, Phase ⅢAbay Bridge over Blue Nile River

Client

Ethiopian Roads Authority

Contractor

Kajima Corp.

Product

Steel Finger joint

Bale Bridge

Client

Agence Autonome Des Travaux Routier/Republique De Senegal Ministere/De Lequipement Et Des Transports/Republique Du Mal

Contractor

-

Product

Pot Bearings(BP・B)/Slotted Pipe Chain Restrainer(SP)

Paso Real Bridge

Paso real bridge
Photo:JICA
Client

Public Works of Ministry of Construction

Contractor

Ando-Hazama Corp.

Product

Pot Bearings(BP・B)/Slotted Pipe Chain Restrainer(SP)

Bougainville Coastal Trunk Road

Bougainville Coastal Trunk Road
Photo:JICA
Client

Autonomous Bougainville Government Division Of Technical Services

Contractor

Dai Nippopon Construction

Product

Horizontal Force Dispertion Rubber Bearing

Machang Bay Bridge

Machang bay bridge
Client

Korea

Contractor

BRITEC CO.,LTD.

Product

High Damping Rubber Bearing(HDR-S)

Bukhang Bridge

Client

Pusan Metropolitan City

Contractor

-

Product

High Damping Rubber Bearing(HDR-S)